عربي
english
3- Contacts Unit and Central Control Room
Project Cost : 773,710,000 dinar

period : 180 days

Photos
Details
Location: Karbalaa’ holy shrine of al-imam Al-abbas ( Peace be upon him) The project includes supplying a watching unit and contacts including a number of rooms using nonconductive walls covered with MDF boards in addition to the imported floor boards from abroad with a high level of tolerance so that heavy furniture and modern decoration can be used. The rooms are locked with safety locks insuring the rooms’ safety. The project also includes indoor decorations and illumining with modern properties done by talented hands.